Previous Project                 Next Project

Dexter - Riviera Drive Relocation


Click to view more images

 

Dokken Engineering provided preliminary and design engineering services for the realignment of a major frontage road. The road was realigned for approximately .8 miles to vacate an area adjacent to the SR 125/SR 94 separation and create space for the freeway connectors and associated entrance ramps. The realignment improved the design speed of the roadway from 15 to 40 mph through a combination of horizontal and vertical improvements. Extensive utility relocations, traffic handling, and right-of-way acquisitions were required. Coordination with City of La Mesa, impacted businesses, and residents was required to minimize public hardship.

 

Other services provided by Dokken Engineering included surveying and mapping, signing and striping, utility coordination & relocation, lighting, geotechnical investigations, drainage, noise study, sound walls, landscaping, and presentations to SANDAG and La Mesa City Council. The realignment also required extensive utility relocations, traffic handling, and right-of-way. Full takes were required on over 40 parcels along with numerous partial takes and temporary easements.

Location

La Mesa, CA

 

Client

Caltrans District 11

 

Construction Cost

$1.3 Million