Dokken Engineering successfully managed over 70 Task Orders during the course of this contract. The contract value was $10.5 million over 3 years, which was obligated in full to Task Orders in San Diego and Imperial Counties. Some task orders under this contract include:
- Interstate 5 Corridor: Culvert Inspections, Preliminary Engineering & Cost Estimates, San Elijo Lagoon Floodplain Study, Staging Cost Estimates, Noise Abatement Decision Report (NADR), Creek/Lagoon Floodplain Studies, ADA Project Report
- Interstate 15 Corridor: Culvert Inspections, Storage Facility Utility Design, Traffic Volumes, Traffic Plans, Overhead Signs, Project Management Plan
|
- State Route 52 Corridor: Cuyamaca Interchange PUC Application, Traffic Study, NADR, Retaining Wall Feasibility Study
- State Route 76 Corridor (Middle Segment): Community Impact Assessment (CIA), Wetland Delineation, Air Quality Study, NADR, Traffic Counts, Traffic Forecast Volumes Report, Traffic Plans
- State Route 98 Corridor: Project Report, Traffic Study, NADR, Preliminary Engineering Study
- Interstate 5/State Route 56 Interchange: Preliminary Engineering, Traffic Study, Draft Project Report, Community Impacts
- Brawley Bypass: CMIA Application
|